top of page

TV Pro Gear

  • Designed and installed new Overhead lighting Grid.  

  • Converted Studio Power.  

  • Renovated / restored old Cyc.  

  • Designed and Installed ipad controllable lighting plan for pre-lit Cyc.  

Screenshot 2026-08-26 at 4.58.28 PM.png
Screenshot 2026-08-26 at 4.57.56 PM.png
Screenshot 2026-08-26 at 4.58.37 PM.png
Screenshot 2025-07-16 at 6.59_edited.png
Screenshot 2026-09-02 200524.png
  • Vimeo
  • linkedin

©2026 by Mannino.

bottom of page